> The central heating system is installed on the supply line between the cascade and system pumps.
> The heating system removes air bubbles, sediment, and sludge from the hot water using AISI 304 quality stainless steel wire, collecting them in a central location. The sediment and sludge are then discharged using a sediment and sludge drain valve, while the air bubbles are automatically expelled using an air vent.